Tobey skate park construction - Week 3
Last week digging began, drainage pipes were installed and then everything got buried. This week the design has come to life! On Monday the park was completely flat and leveled. I went by at lunch today (Friday) and saw some real progress being made! The entire snake run was dug out as well as the large bowl toward the east end of the park. If you look at the full size picture you can make out the outline of the bowls being formed. The next stage should be fascinating as the dirt holes are fine tuned and shaped into geometric splendor.
|
|