Week 11: bowl
Hip to roll-in
Date: 09/06/2011
Views: 1013
|
Week 11 : Roll-in
Fresh butter-smooth concrete !
Date: 09/06/2011
Views: 1059
|
Week 11: Bowl
HIp to step-up extension.
Date: 09/06/2011
Views: 1139
|
|
Week 12 : Snake-run
Deep-end of the snake run with fresh concrete
Date: 09/12/2011
Views: 1084
|
Week 12: Snake-run
Blowing concrete on to the wall of the snake-run
Date: 09/13/2011
Views: 1048
|
Week 12: Vert wall
Perfect concrete on the extension in big bowl.
Date: 09/13/2011
Views: 1027
|
|
Week 12: Snake-run
Just after being blow on, after several passes with the trowel.
Date: 09/14/2011
Views: 1037
|
Week 12: Snake-run
Coping level of the run showing contrasting faces of fresh and dry concrete
Date: 09/14/2011
Views: 1181
|
Week 12: Street
Rail, Bank-to-Bank gap and a ledge in the background
Date: 09/15/2011
Views: 995
|